If the LIS-SV is not preset or the settings need to be adapted, the corresponding parameters must be adjusted.
Further chapters at a glance:
P 0.0 Setting the maximum load capacity
P 1.0/P 2.0/P 3.0 Setting the maximum load capacity of the hoist
P 4.0 Setting the switching point of the overload protection for the total load of the crane
P 4.1/P 4.2/P 4.3 Setting the switching points of the overload protection of the individual hoists
P 4.40 Setting the second load-controlled switching point for the total load of the crane
P 4.41/P 4.42/P 4.43 Setting the second load-controlled switching point of the hoists
P 4.5 Setting the load-controlled switching point on the current transformer module
P 5.01 Setting the “rapid load increase” sensitivity
P 5.1 Showing the theoretical service life
P 5.2 Reading the load population recorder
P 5.3 Test at the inspection before initial commissioning
P 5.4 Performing device diagnosis
P 5.6 Setting the current correction factor
P 5.7 Setting the operation on a twin hoist
P 5.8 Enabling operation with ABUS synchronization control system
P 5.10 Enabling operation with ABULiner frequency converter
P 9.9 Exiting the parameter level
P 1.1/P 2.1/P 3.1 Performing a zero point adjustment
P 1.2/P 2.2/P 3.2 Setting with test load
P 1.3/P 2.3/P 3.3 Reading or entering the zero point frequency
P 1.4/P 2.4/P 3.4 Reading or entering the gain factor
P 6.1 Entering the theoretical service life
P 6.2 Entering the starting value
P 6.3 Deleting values (including load population recorder)
P 6.4 Showing actual hours of use S
P 6.5 Showing operating hours Ti
P 7.00 Showing load display of total load
P 7.01/P 7.02/P 7.03 Showing load display of hoist
P 7.1/P 7.2/P 7.3 Showing measurement frequency