Connecting the crane with LIS-SE

 

*   Connect according to the wiring diagram.

 

 

Checking the factory setting

*   Lift the test load.

*   Compare the value shown by the LIS-SE under parameter P 3.0 with the test load.

If the deviation is greater than 10%, the corresponding parameters must be adjusted!

In this case, an adjustment with test load (teach-in) is necessary. See P 3.2 Load display with deactivated overload protection.