Installation overview

 

Gebot Anleitung lesen

Observe the product manuals!

In addition to the points described here, all information in the section “Installation overview” in the other supplied product manuals also applies.

 

For assembly of an entire crane installation:

*   In all supplied product manuals, read the sections “Installation overview” and “Checking the requirements”.

*   First fulfil the requirements in the building (e.g. for overhead travelling cranes, install the crane track; for jib cranes, prepare the foundation,...).

*   Then, depending on the individual components, define the order of the installation work.

*   Finally, follow the respective sections for “Installing” in all product manuals according to the defined order to assemble the crane.

*   If necessary: Protect the crane from rain, snow, wind or cold. See Equipping the crane for operation in unprotected environments.

*   Next, connect the crane to the mains supply. See Connecting the crane to the mains supply.

*   Finally, carry out the test before initial commissioning. See Test before initial commissioning.