Lifting the overhead travelling crane onto the crane track

 

Warnung Vorsicht

Danger to persons from falling components!

The crane can fall and kill or injure people if it is not correctly attached and lifted.

Attachment and lifting should only be carried out by trained persons.

 

 

Attaching the main girders

*   Place suitable lifting tackle around each main girder and clip into place.

Do not wind the same lifting tackle around both main girders. Otherwise the main girders can twist and be damaged.

*   Cover all edges of the main girder with suitable edge protection.

 

Only with energy chains

*   If the profile rails (in which the energy chain is) protrude to the side, lay wooden beams (wider than the profile rails) over the profile rails so that they are not damaged on lifting.

 

 

 

 

*   Adjust the lifting tackle in such a way that the main girder hangs straight when it is lifted.

 

 

Placing the overhead travelling crane on the crane track

*   Observe the occupational health and safety requirements and lift the overhead travelling crane.

*   Rotate the overhead travelling crane in such a way that the direction corresponds to that in the layout plan.

*   Place the overhead travelling crane with wheels onto the crane track.

*   For guide rollers only: Do not set the overhead travelling crane down with the guide rollers. Otherwise, they will be damaged.

*   Check whether all wheels come into contact with the crane track.