Performance features

The HB system:

─     The HB system is a well-organised assortment of crane components whose modular construction enables you to put together individual crane installations.

─     In order to take all the characteristics of the building into account, every HB crane installation is adapted to the specific application and calculated with customer-specific parameters.

 

 

The HB profile rails:

─     For the crane girder, the sizes HB150, HB190 and HB240 are available.

─     Depending on the application case, the HB profile rails are each available as extruded aluminium HB profile rails in the sizes HB150 and HB190 (indicated by A in the product designation) or as one-piece cold-rolled steel HB profile rails in the sizes HB150, HB190 and HB240 (indicated by S in the product designation).

─     Thanks to a single-piece rolling process, the steel HB profile rails have increased precision and an optimised travel gap geometry that is comparable to aluminium HB profile rails. This noticeably reduces the rolling resistance during manual movements.

─     The HB profile rails in the size HB240 have crosswise screw fittings installed inside and rolled-in beading. This provides the HB profile rails with an optimal weight for greater stiffness, which has a favourable effect on the loads placed on the supporting structure while ensuring easier travel on the crane girder.

─     The HB profile rails can be connected with each other at any position using clamping plates. The positions of the suspensions do not have to be considered. Extensions of HB profile rails are possible without reconstruction on the existing HB crane installation. The length of the individual profile rail sections can also be freely selected, which can be useful in demanding installation situations.

─     The joining of the profile rail sections by means of clamping plates (profile joint) requires only a precise saw cut, but no welding or mechanical processing of any kind. This enables extensions or other modifications of existing HB crane installations to be carried out with less effort.

─     The steel HB profile rails are galvanised and laminated at the sides as protection against corrosion. This makes painting them unnecessary.

 

 

Electrical system of the HB crane installation:

─     The entire electrical system has a modular construction to enable easy expansion of the HB crane installation.

─     The electric connections of the HBF drives, the chain hoist and all other components are of a plug-in type for fast assembly, replacement and reconstruction of the HB crane installation.

─     For conductor systems: in contrast to the festoon cable system there is no cable marshalling point, which means the crane stop clearance and the trolley stop clearance at the ends of the crane track are very limited. This also allows transport of loads in the operating range boundaries of the HB crane installation.

─     The crane can be equipped with a conductor system VKL or KBH as the trolley power supply. In this case, there is no cable sag from the festoon cable system.

─     The crane track can be equipped with a conductor system KBH as the mains power supply. In this case, there is no cable sag from the festoon cable system.

 

 

The double-girder crane ZHB-I:

─     The crane does not need a separate crane track, it can be moved directly on an existing I-beam (e.g. building supporting structure).

─     This means the crane is suitable for low buildings as well, since no additional height is required under the hall ceiling for a crane track.

─     Depending on the supporting structure, the crane girder projects more or less far over the crane track at the side. This allows the crane to be used in areas such as directly against the building wall.

─     The double girder crane ZHB-I has a higher maximum load capacity and a greater lifting height as compared to the single girder crane EHB-I.

─     The HB150A and HB190A sizes with aluminium profile rails have an especially low dead weight. This allows even easier moving of crane girders by hand.

─     The crane can be equipped with a mobile control on the crane girder (version).

─     The crane can be moved electrically or by hand.