Preparing the wall mounting: wall mounts

The holes for the wall mounts are now made in the supporting structure (e.g. building supports, steelwork).

 

Only with wall mounting using wall mounts

 

Drilling the holes

Spirit level

Supporting structure

*   Take the crane connection dimensions of the crane drawing and transfer to the supporting structure.

Ensure the plumb-vertical position of the slewing axis!

 

 

Drill

Drilled hole

 

Supporting structure

*   Drill the holes.