The holes for the wall mounts are now made in the supporting structure (e.g. building supports, steelwork).
|
Spirit level |
Supporting structure |
|
| |
Take the crane connection
dimensions of the crane drawing and transfer to the supporting structure.
Ensure the plumb-vertical position of the slewing axis!
|
Drill |
Drilled hole |
|
| |
|
|
Supporting structure |
Drill the holes.