The wall bracket is now installed with threaded rods and counter plates.
Supporting structure |
Marking |
|
Take the crane connection
dimensions of the crane drawing and transfer to the supporting structure.
Drill |
Supporting structure |
|
Drill the holes.
Hexagon head screws, hexagonal nuts and washers for fastening the jib crane | |
| |
Wall bracket |
|
Push the hexagon head screw (4x)
through the wall bracket holes from the inside.
Secure the hexagon head screws
from the inside (e.g. with adhesive tape).
Screw the washers (4x) and
hexagonal nut (4x) onto the hexagon head screws.
Position wall bracket on the
fork of a suitable lift truck.
Bring the wall bracket into the
correct position.
On the front side of the wall:
Spirit level |
Wall bracket |
| |
Threaded rod |
Washer and hexagonal nut |
Loosely insert the threaded rods
(4x) through the wall bracket and building wall and loosely secure with washers
(4x) and hexagonal nuts (4x).
Check the position with a spirit
level.
Threaded rod |
Hexagonal nut |
| |
Wall bracket |
Washer |
Fasten the wall bracket in the
front with washers (4x) and hexagonal nuts (4x).
The threaded rod must connect flush with the front edge of the wall bracket, otherwise the slewing range is limited.
Tighten hexagonal nuts according
to the table.
Hexagonal nut |
Tightening torque |
M24 |
135 Nm |
M30 |
300 Nm |
On the rear side of the building wall:
Counter plate |
Washer |
| |
Lock nut |
Hexagonal nut |
Push counter plates (4x) onto
the threaded rods.
Fasten the counter plates with
washers (4x), hexagonal nuts (4x) and lock nuts (4x).
| |
Fastening the counter plates with washers, hexagonal nuts and lock nuts |
|
● All four counter plates are attached.
Tighten hexagonal nuts according
to the table.
Hexagonal nut |
Tightening torque |
M24 |
135 Nm |
M36 |
470 Nm |
On the front side:
Threaded rods with lock nuts and washers |
Wall bracket |
|
● The wall bracket is now attached.