Depending on the crane design, a HF/EF trolley is now installed and connected as a hoist trolley with a chain hoist as a hoist, or a wire rope hoist in the following section.
The EF electric trolley must be installed so that the drive is located on the opposite side of the trolley power supply.
Pre-assemble the trolley,
install the trolley on the jib arm, install the trolley towing arm. See the ABUS
trolley product manual.
Only with a trolley travel
limit switch: install the trolley travel limit switch. See the ABUS trolley
product manual.
The direction in which the chain hoist is installed is specified in the planning documents.
Install the chain hoist.
See the product manual for the ABUS chain hoist.
Connect the chain hoist.
See the product manual for the ABUS chain hoist.
The chain hoist is connected to the trolley power supply using one or two bayonet connectors. See the wiring diagram.
Only with a trolley drive:
connect the trolley drive. See the ABUS trolley product manual.
The trolley drive is
connected using a connection cable from the chain hoist or from the trolley
power supply. See the wiring diagram.