Now the clamping buffers are mounted on the jib tip and on the jib arm start point.
|
Rubber buffer |
Vertical
fillister-head |
|
| |
|
Horizontal fillister-head screw M12 |
Clamping buffer |
Rotate the clamping buffer
so that the rubber buffers are pointing towards the trolley.
Push the clamping buffer
onto the lower flange on the jib arm.
Tighten the vertical
fillister-head screw slightly on one side.
Then tighten the other
vertical fillister-head screw and the horizontal fillister-head screw
slightly.
Align the clamping buffer
so that both clamping claws are lying flush and parallel on the flange.
For the clamping buffer on the jib tip: also make sure that there is an interval of at least 5 mm between the end of the clamping buffer and the jib tip.
Tighten the vertical
fillister-head screws M16 (2x). 120 Nm.
Then tighten the
horizontal M12 fillister-head screw. 80 Nm.
Push the rubber buffer
right down onto the flange.