The following requirements must be met in order for the wire rope hoist to be installed:
Among other things, these points must be coordinated as part of the technical authorisation process:
─ The welded box girder or I-beam on which the wire rope hoist travels must meet the specifications of the enclosed dimension sheet and data sheet.
─ The welded box girder or I-beam that the wire rope hoist travels on must have a straight lower flange or parallel flange.
─ The dimension between the flanges of the wheels is permitted to be maximally 2 mm larger on each side than the measured width of the bottom block.
─ The trolley power supply must be executed as ABUPowerline energy chain or ABUS festoon cable system.