|
Falling suspended load! Working with two cranes in tandem operation In tandem operation, watch the load, cranes and area travelled over very carefully. Press the emergency stop button in the event of any problems or danger. If necessary, work with an additional banksman. Only lift the load as far as necessary. |
Use the buttons for crane
travel, trolley travel, lift and lower to lift and transport the load.
See the radio remote control product manual.