If the trolley towing arm has not been installed yet, continue here. Otherwise, skip this section.
The trolley towing arm is installed above the hoist panel. It pulls the electrical cables for the trolley power supply (festoon cable system or energy chain) and the cross-type limit switch of the trolley travel limit switch back and forth parallel to the trolley.
The trolley towing arm must be installed differently, depending on the main girder and the type of power supply (festoon cable system or energy chain).
The energy chain is fastened to the horizontal carrying tube.
|
Individual components of the energy chain |
| |
|
|
Cable ties |
Flat cable | |
| ||
Connection element |
Energy chain | |
Lead the flat cable out of the
energy chain and guide in a curve around the deflection bracket.
Fasten the flat cable with cable
ties to the upper section of the deflection bracket.
Insert the energy chain into the
connection element and click into place.
|
End carriages |
| |
Trolley towing arm |
Wheel |
Screw the trolley towing arm
with the threaded bracket and M8 rib nuts to the end carriage. 15 Nm.
In doing this, make sure the wheel is not blocked.
|
Trolley towing arm |
| |
Vertical square tube |
Pipe clamps with M8 rib nuts |
Screw the square tube tightly to
the trolley towing arm with the pipe clamps and M8 rib nuts. 15 Nm.
Vertical square tube |
Towing trolley |
| |
Pipe clamp with M8 rib nuts |
Horizontal square tube |
Push the horizontal square tube
into the towing trolley.
Screw the horizontal square tube
to the vertical square tube with pipe clamp and M8 rib nuts. 15 Nm.