If the fixed point crosshead, the rope socket or the rope wedge are damaged, they must be replaced.
SL safety clip |
|
Bolt |
Pull the SL safety clips (2x)
from the bolts.
Bolt | |
| |
|
Fixed point crosshead |
Pull the bolts (2x) out of the
fixed point crosshead.
|
Fixed point crosshead |
| |
Bearing bushes |
Lift the fixed point crosshead
from the bearing bushes.
This section only applies to a wire rope hoist with a load indicator system LIS-SE. For a wire rope hoist with a load indicator system LIS-SE, the rope socket is fastened to the fixed point crosshead with a bolt and an SL safety clip.
SL safety clip |
Fixed point crosshead |
| |
|
Bolt |
Pull SL safety clip from the
bolt.
Fixed point crosshead |
Bolt |
| |
Rope socket |
|
Pull the bolt out of the fixed
point crosshead and the rope socket.
Pull the rope socket out of the
fixed point crosshead.
This section only applies to a wire rope hoist with a load indicator system LIS-SV or ABUControl. For a wire rope hoist with a load indicator system LIS-SV or ABUControl, the rope socket is fastened to the fixed point crosshead with a measurement bolt and a mount.
Mount |
Rib screw |
| |
Measurement bolt |
Fixed point crosshead |
Release rib screw M6x12.
Slide the mount from the
measurement bolt.
Fixed point crosshead |
Measurement bolt |
| |
Rope socket |
|
Pull the measurement bolt out of
the fixed point crosshead and the rope socket.
Pull the rope socket out of the
fixed point crosshead.
|
Rope socket |
| |
End of the wire rope |
Dead end rope grip |
Release the rib nuts on the dead
end rope grip.
Pull the dead end rope grip from
the end of the wire rope.
Rope wedge |
|
| |
Wire rope |
Rope socket |
Pull the rope wedge with wire
rope out of the rope socket.
Rope wedge |
|
| |
End of the wire rope |
Rope socket |
Lay the end of the wire rope
around the rope wedge.
The wire rope must lie level in the groove of the rope wedge!
Push the rope wedge with wire
rope into the rope socket and pull it to the end of the wire rope with a jolting
tug.
● The rope wedge slips into the rope socket and clamps the wire rope.
|
Rope socket |
| |
Wire rope |
Dead end rope grip |
Push the dead end rope grip onto
the end of the wire rope.
Screw in rib nuts of the dead
end rope grip.
Size |
Nut |
Tightening torque |
GM 800 |
M6 |
5 Nm |
GM 1000 |
M8 |
10 Nm |
GM 2000 |
M8 |
10 Nm |
GM 3000 |
M12 |
10 Nm |
| |
|
Rope socket |
Lubricate the rope socket.
Lubricant: “High temperature paste PBC 1574”. For details, see Lubricants.
This section only applies to a wire rope hoist with a load indicator system LIS-SE. For a wire rope hoist with a load indicator system LIS-SE, the rope socket is fastened to the fixed point crosshead with a bolt and an SL safety clip.
Fixed point crosshead |
|
| |
|
Rope socket with rope wedge and wire rope |
Push the rope socket with rope
wedge and wire rope into the fixed point crosshead.
Note the marking on the fixed point crosshead.
Fixed point crosshead |
Bolt |
| |
|
Rope socket |
Push the bolt through the fixed
point crosshead and the rope socket.
SL safety clip |
Fixed point crosshead |
| |
|
Bolt |
Push the SL safety clip onto the
bolt.
This section only applies to a wire rope hoist with a load indicator system LIS-SV or ABUControl. For a wire rope hoist with a load indicator system LIS-SV or ABUControl, the rope socket is fastened to the fixed point crosshead with a measurement bolt and a mount.
Fixed point crosshead |
|
| |
|
Rope socket with rope wedge and wire rope |
Push the rope socket with rope
wedge and wire rope into the fixed point crosshead.
Note the marking on the fixed point crosshead.
Fixed point crosshead |
Measurement bolt |
| |
|
Rope socket |
Push the measurement bolt
through the fixed point crosshead and the rope socket.
The arrow on the measurement bolt must point downward!
Mount |
Rib screw |
| |
Measurement bolt |
Fixed point crosshead |
Check the mount for
deformations.
If the mount is deformed, it must be replaced.
Slide the mount onto the
measurement bolt.
The mount must allow itself to be inserted into the groove of the measurement bolt without tension.
The measurement bolt should not have any pretension!
Screw on the mount with the rib
screw M6x12. 19 Nm.
|
Fixed point crosshead |
| |
Bearing bushes |
Mount the fixed point crosshead
on the bearing bushes.
When doing this, ensure that the marking on the fixed point crosshead points in the direction of the hoist drive.
Bolt | |
| |
|
Fixed point crosshead |
Push the bolts (2x) into the
fixed point crosshead.
SL safety clip |
|
Bolt |
Push the SL safety clips (2x)
onto the bolts.