P 5.3 Test at the inspection before initial commissioning

This parameter is used to manually switch the relays for the outputs of the LIS-SE.

 

Note

This function is normally used by the expert for the test before initial commissioning.

The overload protection is deactivated in this parameter! After 45 minutes the parameter closes automatically and the overload protection is reactivated.

 

Warnung stürzende Last

Danger due to deactivated overload protection!

The overload protection is deactivated in this parameter.

This can lead to an overload of the crane. This in turn means the raised load could fall and kill or injure people!

Do not overload the crane and always operate it with caution.

 

 

Display

Function

1

Lifting/Lowering disabled

2

Slow lifting/lowering enabled

3

Slow and fast lifting/lowering enabled

4

Slow and fast lifting/lowering enabled

Second load-controlled switching point bypassed

5

Not assigned

 

*   Call up parameter P 5.3 with the arrow buttons.

*   Press Enter briefly.

●   The parameter is opened and the first value from the table is displayed.

*   Press Enter briefly to switch between the values.

*   Check functions.

*   Hold Enter pressed.

●   P 5.3 appears on the display.