| |
Cable grip |
|
If necessary: fix the cable
grips (2x) with rivets.
|
Connector housing |
| |
Cable ties |
Connection cable |
Lay the connection cable from
the connector housing along the cable grips to the other side of the
trolley.
Fasten the connection cable to
the cable grips with cable ties.
Lay the connection cable with
all other connection cables (e.g. from the chain hoist) along the power carrier
and fasten with cable ties.
The connection cables lead from the power carrier to the power supply. Depending on the crane, this is either a conductor system, an energy chain or a festoon cable system.