If the HB crane installation is not installed immediately:
Leave the profile rail sections
packaged during storage.
If the packaging of the wrapped
profile rail sections has become wet: leave the profile rail sections in their
packaging, but open the packaging so that moisture can escape.
Wipe off any rainwater.
Store unpainted metallic parts, chain
hoists, electrical and electronic components in a dry, dust-free place.
If the anchor rods are not installed immediately:
Store injection mortar in the way
specified on the dowel set packaging.
Clearly allocate the individual parts
when storing them. The components must not be replaced with, or be combined
with, individual parts for different cranes.
Should the HB crane installation be installed after it has been in storage for a lengthier period:
Perform a visual inspection of all
components. They should be neither heavily soiled nor dusty.
For painted or coated components:
check surfaces. The paint or coating should not be cracked or peeling.
Check the profile rail sections. The
zinc layer should not be damaged or heavily scratched.
Inspect metallic
parts. They should exhibit no rust.
Inspect electrical components. Live
parts (e.g. bushes, pins and terminals) should not be oxidised (e.g. discoloured
or roughened surface).