The threaded rods from which the crane track will later be hung are now fitted on the installed ceiling-mounted bracket for the vertical load-bearing section.
|
|
This product manual describes the installation of an M16 suspension. To install an M20 suspension, see product manual "Installing the ceiling-mounted bracket 4LP/M20 and craneway suspension M20". |
On the additional ceiling-mounted bracket for the stiffener, the individual parts of the stiffener are mounted and these are then connected with the vertical load-bearing section.
Overview:
|
|
|
Size |
HA |
HS |
|
HB110 |
HA = |
HS = |
|
HB150 |
HA = |
HS = |
|
HB190 |
HA = |
HS = |
|
HB240 |
HA = |
HS = |
Minimum length of the threaded rod on the vertical load-bearing section (LW1) is 300 mm
On upper end of the threaded rod:
|
Clamping joint |
Tension nut |
|
| |
|
Threaded rod |
Hexagonal nut |
Screw the M16x1.5 hexagonal nuts (2x) onto the shortened or
lengthened threaded rod.
Screw the threaded rod into the tension nut until the end of the
threaded rod is flush with the tension nut on the inside (see enlarged section
of the illustration)
Lock with hexagonal nut.
On the ceiling-mounted bracket:
|
SL safety clip |
Articulated girder |
|
| |
|
Clamping joint |
Bolt |
Insert the clamping joint between the articulated girders on the
ceiling-mounted bracket.
Insert bolt through articulated girder and clamping joint.
Secure bolt with SL safety clip.
On the lower end of the threaded rods an articulated girder is now installed. This is where the vertical load-bearing section will later be connected with the stiffener.
On lower end of the threaded rod:
|
Hexagonal nuts |
Threaded rod |
|
| |
|
Articulated girder |
|
Screw the M16x1.5 hexagonal nuts (2x) about 40 mm onto the
threaded rod.
Insert the articulated girder on the threaded rod.
The ceiling-mounted bracket of the stiffener is now connected with the previously mounted articulated girder of the vertical load-bearing section.
|
|
Determine the length of the threaded rod (a) for the stiffener.
To do this, measure the distance of the two holes (b) between the articulated girders and subtract twice the inner length of the clamping joint (c = 2x 56 mm).
Shorten the threaded rods for the stiffener to the determined length.
On both ends of the threaded rod:
|
Threaded rod |
Tension nut |
|
| |
|
Clamping joint |
Hexagonal nut |
Screw the M16x1.5 hexagonal nuts (2x) onto the shortened or
lengthened threaded rod.
Screw the threaded rod into the tension nuts (2x) until the end of
the threaded rod is flush with the tension nut on the inside (see enlarged
section of the illustration).
Lock with hexagonal nut.
On the ceiling-mounted bracket:
|
Ceiling-mounted bracket of the stiffener |
Articulated girder |
|
| |
|
Bolt |
Clamping joint |
Insert the clamping joint between the articulated girders on the
ceiling-mounted bracket of the stiffener. Use the hole facing the vertical
load-bearing section.
Insert bolt through articulated girder and clamping joint.
Secure bolt with SL safety clip.
On lower end of the stiffener:
|
Bolt |
Clamping joint |
|
| |
|
|
Articulated girder |
Insert clamping joint between the articulated girder on the vertical
load-bearing section. Use the hole facing the stiffener.
Insert bolt through articulated girder and clamping joint.
Secure bolt with SL safety clip.
The HB crane runway will later be installed on the lower end of the threaded rod.
Check for play of the stiffener.
The stiffener should not hang loosely or wobble between the two articulated girders. It must sit firmly and without play on the articulated girders.
If the stiffener has play:
Turn the tension nut in the clamping joint to tension the threaded
rod until the stiffener lies free of play between the articulated girders.