Inspecting the bolted connection on the flange plates

 

The pictures show the procedure on a GM 1000 modular wire rope hoist. The procedure on GM 800 does not differ significantly from this.

 

On both flange plates:

Flange plate

 

Hexagon head screws

 

*   Check the hexagon head screws. They must be tightened to 85 Nm.

Size

Screws

Number

GM 800

M12x40

10x

GM 1000

M12x40

15x

*   If the hexagon head screws have not been screwed in properly: Tighten the hexagon head screws. 85 Nm.