Assembling the towing arm of the mobile control

 

Only with mobile control with energy chain

The towing arm of the mobile control was disassembled for the transport of the crane. It must be reassembled.

 

Clamping plate

Recess

Towing arm

Rib screw M8x25

*   If necessary: Release the transport fastenings (e.g. cable ties) from the towing arm.

*   Undo the rib screws M8x25 until the clamping plate has several millimetres clearance to the towing arm.

*   Tilt the towing arm and push the clamping plate into the recess on the control trolley.

 

 

Lug

Recess

Towing arm

Control trolley

*   Push the towing arm to the right into the control trolley.

*   Push the lug of the towing arm into the recess.

 

 

 

Rib screws M8x25

*   Push the towing arm to the right.

*   Screw in the rib screws M8x25 (2x). Tighten to 36 Nm.