Installing the individual parts on the crane

 

 

Operating direction signs

*    Rotate the operating direction signs to match how they are marked in the layout plan.

*    For spans under 10 m only: Attach operating direction signs for the crane and trolley under the middle of the main girder.

*    Only for spans greater than 10 m: Attach operating direction signs for the crane and trolley to the left and right, in each case 2.5 m away from the end carriage.

 

 

Installing the lift-off prevention device

Lift-off prevention device

 

*    Bolt on the lift-off prevention device with M16x30 rib screws (4 on each device). 300 Nm.

 

 

Installing the guard plates and brushes on the lower end carriage

Buffer plate

Guard plate

Lower crane track

Brush

*    Install the guard plates on the left and right on both ends of the lower end carriage. Bolt them on with M6x20 rib screws (2 per guard plate). 19 Nm.

*    Install brushes on the buffer plate on both ends of the lower end carriage. Bolt on with M6x25 rib screws (2 per brush).