Replacing the bearing disc in the clamping joint

 

If the lower groove can be seen on the tensioning nut, the bearing disc must be replaced.

 

 

Securing the crane girder

*    Secure the crane girder (e.g. using a suitable lashing strip) to prevent it falling.

*    Relieve the load on the crane girder to such an extent that the weight is no longer exerted on the crane girder suspension.

 

 

Removing the clamping joint

Washer

Locking pin

*    Pull the locking pin out.

*    Dispose of the locking pin. It must not be used again.

*    Take the washer off the threaded rod.

 

 

Locknut

Threaded rod

Circlip

Tensioning nut

*    Loosen the locknut.

*    Hold the tensioning nut tight and screw the threaded rod upwards and out of the tensioning nut.

*    Take the circlip off the tensioning nut.

 

 

Replacing the bearing disc

Bearing disc

Tensioning nut

Clamping joint

 

*    Pull the tensioning nut down and out of the clamping joint.

*    Take the bearing disc off the tensioning nut.

*    Fit a new bearing disc to the tensioning nut.

*    Push the tensioning nut into the clamping joint from below.

 

 

Mounting the clamping joint

Locknut

Threaded rod

Circlip

Tensioning nut

*    Insert the circlip in the upper groove on the tensioning nut.

The lower groove must remain free and is used to check the bearing disc wear.

*    Hold the tensioning nut firmly and screw the threaded rod into the tensioning nut from above.

*    Secure using the locknut.

*    Insert the washer from below.

*    Push a new locking pin in place and secure it.