Fastening the end carriages tightly

 

Once all components have been installed, the entire crane has settled as a result of the weight, and the stress is relieved. For this reason, the end carriages can only now be tightened with the tightening torque.

 

 

Central high-tensile bolt

Remaining high-tensile bolts

 

─     Only tighten high-tensile bolts with the appropriate torque wrench.

─     Do not use an impact wrench.

─     Do not tighten high-tensile bolts using turn-of-nut tightening.

*    Tighten the central high-tensile bolts on both sides (left and right on the end carriage). Use a torque wrench to 300 Nm.

*    Next, tighten the remaining high-tensile bolts, alternating between left and right. Use a torque wrench to 300 Nm.

*    Then tighten all high-tensile bolts in the same sequence. Use a torque wrench to 450 Nm.

 

Note

 

Mark the high-tensile bolts with a permanent marker with a continuous line from the bolt head over the washer to the plate. This serves as proof that all high-tensile bolts have been tightened with tightening torque.