Connecting the crane with ABULiner

 

Connecting the crane to the mains supply

*    Connect the power line in accordance with EN 60204.

*    Provide a permanent connection in accordance with DIN EN 50178, as the leakage current is large than 3.5 mA.

 

 

Selecting a fault current protection switch

If a fault current protection switch is to be used:

*    Only use a fault current protection switch which is sensitive to universal current and which is suitable for operation with the frequency converter.